Why is "minimum slack" the first criteria for the parallel method heuristic?

 Why is "minimum slack" the first criteria for the parallel method heuristic?

Critical activities will have the minimum amount of slack in a network.

Reason:

Hence, the heuristic is trying to protect the scheduled end date